Quarve Contracting: Remodel Type I Bronze

Remodel Bronze IQuarve ContractingQuarve Contracting, Inc. has completed a Minnesota GreenStar Pilot remodeling project for the Gitzen home, a 1957 rambler in Roseville. Homeowners, Chuck and Kathy Gitzen worked with Quarve Contracting, Inc. by volunteering some sweat equity. They’ve installed their own rain garden, indoor and outdoor compost bins, rain barrels and reducing their energy costs by installing CFL lighting. Green Remodeling does not need to add extra costs to a remodeling project.  It can reduce homeowner’s energy costs well into the future. The Gitzen’s scope of work included; reinsulating the home, sealing bypasses, which resulted in a 44% tighter home. This came in as one of the tightest home tested for MN GreenStar. We removed a side door on the west side of home and installed a new window in the south side. The light switch in the room was switched so one switch could shut down all computer monitors and cpu units.  We also installed: windows, solar tubes, energy effeicent doors, Energy Star rated appliances and life-time warranty – Energy Star rated – United States Platinum Seamless Steel Siding with a natural drainage plan and ceramic based paint which is solar reflective.  Ventilation was also an issue, we brought the home up to manufacturer specifications as there was no soffit ventilation before.By Julie Quarve, Quarve Contracting

Quarve Contracting - Before
For more information on this project visit
 www.quarve.com.

Mike Otto Construction: Remodel Type IV Silver

Remodel Silver IVMike Otto ConstructionThe owners of this split-level home wanted an addition that was healthy and provided more space. The problems with this home were its uneven slope and its lack of natural lighting and good flow. To fix these concerns the yard was carved evenly to the ground before the addition started and the positioning of the porch was placed in the most direct sunlight to provide ample natural lighting. An addition was added to the back of the existing house to provide additional spaces: an office, dining room, family room and a four season sunroom. By adding skylights in the great-room it fixed the problem of lighting and made the space more open. From start to finish this project was designed, constructed, and finished in GREEN and followed the state green certification requirements which included: tests, energy calculations and inspections. The homeowners enjoy the extra space with lower energy bills.The homeowner commented on our project that “We chose Mike Otto as a builder based on four primary things:  quality, reliability, cost, and his support of doing a green project. Mike was supportive of doing a green remodel from the beginning; he actually got us involved in GreenStar.  He helped tremendously as we made choices based on the GreenStar checklist, and gave us a lot of guidance on some of the things you don’t see when you look at the new space — things like framing techniques, insulation and heating and cooling.  The final product is beautiful, well-executed and built to last.”By Mike Otto, Mike Otto Construction

Mike Otto ConstructtionMike Otto Construction For more information on this project visit www.moconstruction.com.