Rinnovare Inc./Acacia Architects: Remodel Type III Gold

Remodel Gold III

Rinnovare/Acacia Kitchen
Photo by Dana Wheelock

Empty Nesters

This small rambler was a great find – to the right couple. Only modestly modified since its original construction, this home had good bones, a great location that abutted a marsh and was ripe for an extensive renovation.

The customer and Acacia Architects spent a significant amount of time and effort specifically designing the home to meet their needs as well as to achieve at least a Silver Certification from MN GreenStar. Nearly a year later, the project was complete and exceeded customer’s expectations of achieving a Gold certification within budgetary guidelines.

Rinnovare, now working on its 2nd MN GreenStar remodel, provided a smooth and well planned project to insure green planning through documentation was executed in the most efficient manner. From deconstruction services to reuse as much of the old cabinetry and woodwork to asbestos abatement to radon mitigation, zoned heating and tankless water heating, the project was truly green. Finishes were deliberately all low VOC and surprisingly, after construction and the client moved in, the house was without that typically noticeable “new car smell” of chemicals off gassing. The project was completed with an exceptional landscape design which will minimize water needed for irrigation.

This project exemplified the standards of holistic green building and will be a showpiece for the client for years to come.

By Mike Williams, Rinnovare Inc.

For more information on this project visit www.rinnovareinc.com and www.acaciaarchitects.com.

Metropolis Construction: Remodel Type III Silver

Remodel Silver IIIMetropolis

Our goal was to turn our newly acquired and somewhat run down bungalow into a beautiful and comfortable home that was as energy efficient and eco-friendly as possible. We wanted to do this in a way that created modern conveniences and utilized modern technologies, while preserving the craftsman aesthetic of our 1918 home. Our project is a certified Silver, Type III project, which included adding two dormers to create a master suite on the second floor, remodeling the kitchen, and generally sprucing it up. The key energy efficiency features of our home include: closed cell foam insulation in all available applications, redesign of the HVAC system, high efficiency furnace, tankless hot water, energy efficient lighting and appliances, and high performance windows and doors for all new applications. We insulated the sash pockets and reglazed the existing windows to improve the efficiency of the existing windows. Many of the materials used were salvaged and environmentally-friendly, including flooring remilled from an old barn, a kitchen countertop made of 100% paper, and salvaged or FSC-certified lumber and millwork. Throughout the project, we made every effort to reuse materials and minimize waste. The home’s proximity to a light rail station and urban amenities cuts car trips, which further reduces our carbon footprint.

By Carolyn Brouillard, Homeowner

Metropolis Kitchen BeforeMetropolis Kitchen After

For more information on this project visit www.metropolismn.com.

Buck Brothers Construction Inc.: Remodel Type III Gold

Remodel Type III Gold

Buck Brothers Construction

This 1960 rambler nestled along West River Parkway in the Seward neighborhood of Minneapolis, possessed owners who were dedicated to both the concept and the spirit of sustainable and healthy construction.  The impetus for their project was to provide better living space for themselves and their two daughters by adding a second floor.  The new level houses two bedrooms, a common bathroom and a laundry room.

When Buck Brothers Construction broached the idea of attaining GreenStar certification, the home owners enthusiastically signed on.  From beginning planning through the construction phases a collaborative process was put into play to ensure that all the participants (designers, contractors, suppliers and homeowners) “owned” the goal of creating a highly livable, energy efficient addition.

During demolition the roof framing was salvaged and re-sawn to create the railings for the new staircase.  A dozen re-claimed doors were installed in doorways by the carpenters and as a unique closet partitioning system by the homeowner.  Trees harvested from the neighborhood were transformed into beautiful flooring and cabinetry by a local company, Wood From the Hood.  A new high-efficiency furnace and air-to-air exchanger, coupled with super tight construction standards put a lid on energy costs while raising indoor air quality.  Water conservation was achieved by installing low-flow toilets, water restrictors on faucets – and rain barrels to feed the xeriscape garden.  Even the dumpster service played a part, by recycling over 66% of the construction debris.

The best testament to the success of the project, and the enduring quality of the relationships, is that the clients have contracted for another remodeling project with the same quest for “green” practices and certification!

By Bob Buck, Buck Brothers Construction Inc.

Buck Brothers Construction - Stairs Buck Brothers Construction - Bedroom

Buck Brothers Construction - Bathroom

For more information on this project visit www.buck-bros.com.

Morr Construction: Remodel Type III Gold

Eian Residence — Minneapolis, MN

This neglected and partially obsolete 1927 Minneapolis home was in desperate need of repairs and updates. Not only was it lacking a design identity—all trim and period details had been yanked—but its performance (comfort and energy bills) was extremely poor as well. Homeowner and German-born architectural engineer Tim Delhey Eian used a holistic approach pioneered locally by TE Studio to address both shortcomings and bring his family home into the 21st century.

The house features around 2,500 finished square feet in its two-story layout, including a finished basement.

Over the course of 8 years, the home saw key updates and enhancements in these categories:

  • Building envelope updates consisting of new ventilated metal and fiber-cement board siding, vented standing-seam metal roofing, new continuous weather barriers, improved airtightness, and added insulation levels; new windows and exterior doors
  • Second-floor addition built with reclaimed, recycled and FSC lumber and local materials; advanced stick framing techniques
  • New building envelope surfaces with high R-values (walls R-25 to 30; roofs R-60) with closed cell spray foam and cellulose insulation; diligent air-sealing techniques
  • Mechanical systems including new heating plant and zoned distribution with programmable thermostats; new domestic hot water system and plumbing with low-flow fixtures throughout; addition of heat-recovery ventilation and heatpump air-conditioning
  • Energy star appliance package
  • Low and no VOC finishes throughout
  • Earth-friendly landscaping and stormwater management
  • Dimmed low-voltage halogen, CFL and LED lamping throughout

The Eian family is dedicated to living green, sustainably and energy efficiently. The approach chosen resulted in a durable and sustainable retrofit that enables the home to be an asset for the family for years to come. In combination, the carefully tailored design and solutions yielded a GreenStar Gold certification.

For more information on this project visit www.morrconstruction.com.

Design: Tim Delhey Eian, TE Studio, Ltd.
Construction: Various Structural
Engineering: Eric Bunkers, Bunkers and Associates
Photo Credit: Richard Schultz via TE Studio, Ltd.

 

Castle Building & Remodeling: Remodel Type III Silver

This St. Louis Park couple came to Castle Building & Remodeling needing to expand their attic space in anticipation of a new arrival. They knew they wanted to use sustainable and locally sourced materials, convert the household mechanicals to energy efficient systems, and conserve or recycling materials wherever possible. Castle Building & Remodeling designed a unique shed dormer that gave these homeowners nearly 800 sq. ft. of newly finished space, including two bedrooms, a full bathroom and an office/nursery area.

Castle Building & Remodeling

Some of the key elements of this project that qualified it for green certification were:

  • High efficiency heating and cooling systems
  • A tanklesswater heating system
  • Energy Star rated lighting fixtures
  • Low flow plumbing fixtures
  • Advanced framing techniques that conserved on lumber usage
  • Engineered headers and beams to maximize the use of forest products
  • High efficiency windows
  • Advanced insulation techniques to increase R-values and eliminate air leakage
  • No recessed fixtures penetrating unconditioned attic space
  • Lifetime warrantied steel shingles
  • Bituminous roofing over entire low pitch roof areas
  • Fiber cement siding & wood composite exterior trim materials
  • Low VOC paints and finishes
  • Recycled framing and roofing materials salvaged for the existing house
  • A Waste Management Plan to deal with all refuse
  • Rain barrels to collect water runoff from the roof and to be used to water the yard

Castle Building & Remodeling

For more information on this project visit www.castlebri.com.

White Crane Construction: Remodel Type III Bronze

Remodel Bronze III

White Crane Construction
All photos courtesy of VIP 360

White Crane Cosntruction KitchenWhite Crane Construction Living Room

For more information on this project visit www.whitecraneconstruction.com.